From an estimate to a buildable production plan.

A deterministic production-planning engine for construction — with optional agentic access.

Request a pilot Download PDF
Open the deck in a new tab
Concrete-works calculator — takt schedule (Gantt) and a cost and norm-hour summary, sequential vs. parallel.
Concrete-works calculator — takt schedule (Gantt) and a cost and norm-hour summary, sequential vs. parallel.
Agentic access — the same engine called from an AI assistant through the MCP server.
Agentic access — the same engine called from an AI assistant through the MCP server.
Deterministic decomposition — each quantity with its formula, source norm and confidence.
Deterministic decomposition — each quantity with its formula, source norm and confidence.
Request a pilot Download PDF

Alexander Prokopov · info@stavagent.cz · LinkedIn · www.stavagent.cz